SMM Tailgate Mounted Master Mixer

SKU: de50e25ced8c Categories: ,

Description

  • 24 hours a day/ 7 days a week / 365 days a year – Make asphalt when YOU need it at any outside temperature!
  • 300-350°F in 8-15 minutes, depending on the moisture content of your millings.
  • 100% Recycled Materials
  • Simple hook up- Tilt your box, back up to the tailgate hooks, lower box, lift legs, and secure. No additional equipment needed!
  • Honda Engine with Hydraulic Drive.
  • Beckett Diesel Burner with indirect heat to prevent burning and scorching.
  • Adjustable tailgate hooks to fit most any dump body.
  • Simple to use burner timer.
  • Makes a batch in 8-15 minutes.
  • Easily add Asphalt Rejuvenator Product (ARP), which comes in one pound packages and contains 95% straight asphalt, no secret snake oil here, just good old fashioned asphalt.
  • Pre-heat bin to give the next batch a kick start.
  • Removable shoveling pan to allow material to be dispensed right onto the roadway.